RFP Availability: Microtransit Feasibility Study

SJTPO is seeking a qualified firm, or groups of firms, to conduct a feasibility study to determine if microtransit is a viable service model for the Route 54/40 Community Shuttle, which operates in western Atlantic County. This work is included as a one-year study in the SJTPO Draft FY 2023 Unified Planning Work Program (www.sjtpo.org/UPWP). Technical proposals must be prepared and submitted in accordance with the goals, requirements, format, and guidelines presented in this RFP document. To learn more, visit the RFP Webpage.

[UPDATE 02/16/2022]: The feature to receive updates about our RFPs is currently unavailable. Interested parties will need to check the RFP page periodically for updates. We apologize for the inconvenience.

[UPDATE 2/25/2022]: The proposal due date for digital submission has been updated from Tuesday, March 8, 2022 to Tuesday, March 15, 2022. The physical submission is now due Tuesday, March 22, 2022.

Join Our Mailing List

Which mailing list(s) you would like to join? *

Copyright All Rights Reserved © 2022 │ Site Developed by Stokes Creative Group, Inc.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.